About Us
Director (Grid Operations)
Vidyut Soudha, Khairatabad,Hyderabad-500082
Career Profile
|
B. Narsinga Rao has assumed charge as Director of Transmission Corporation of Telangana Ltd., on 06.09.2018. |
|
Born on 5th October, 1946, he completed his graduation in Osmania Engineering College. |
|
He worked in various positions in erst while APSEB, later in APTransco retired as Chief Engineer(TL&SS)/ Warangal. |
|
He has experience in Construction & Maintenance of Transmission Lines and Distribution Operation in Discoms as Director from 28.11.2014 to 04.09.2018 |
Career Profile
|
Born in Hyderabad on 6th February, 1957. Completed Graduation in B.Tech., Post Graduation in MBA (HR) and holding F.I.E., C.Engr. (Ind.). |
|
Assumed charge as Director of Transmission Corporation of Telangana Ltd., on 27.11.2014 and has been incharge of HR, Grid Operations and now Projects. Held Full Additional Charge as Jt. Managing Director of TSTRANSCO. |
|
Appointed as Non-Whole Time Director in TSNPDCL on 17.02.2016 and continuing till date. |
|
Served for more than 39 years in State Power Sector. |
|
Prior to the current position as Director, worked in various positions in erstwhile APSEB, APTRANSCO and in TSTRANSCO since December 1980 till date. |
Sl.No. |
Designation and place of posting |
Organization |
From |
To |
Nature of work / duties attended |
1. |
Assistant Engineer (AE) |
APSEB |
Dec’ 1980 |
14.11.1993 |
1)Turbine Maintenance at VTPS, Shift duties at KTPS. 2) O/o.SE/Plg/V.S.- preparation of plans, layouts and proposals for 220kV & 132kV lines & Substation works. 3) Operation & Distribution |
2. |
Assistant Divisional Engineer (ADE) |
APSEB |
15.11.1993 |
16.11.2001 |
1) In-Charge of Central Stores/Erragadda, 2)Operation & Distribution. 3) CBD- City-3, Charminar. In-charge of all FOCs. |
3. |
EME |
APGENCO |
16.11.2001 |
20.08.2002 |
As EME, in-charge of all coal plants, ash plants and fire fighting system in thermal stations. |
4. |
Divisional Engineer (DE) |
APTRANSCO |
20.08.2002 |
03.03.2005 |
As DE in-charge of Vehicle Cell, Preparation of estimates/ proposals for departmental/ hired vehicles and survey report of old departmental vehicles (field & Head Quarters). |
5. |
Superintending Engineer |
APTRANSCO |
03.03.2005 |
28.08.2006 |
As SE/V.S., in-charge of Vehicle Cell, Preparation of estimates/ proposals for departmental/ hired vehicles and survey report of old departmental vehicles (field & Head Quarters). |
6. |
Chief Engineer |
APTRANSCO |
28.08.2006 |
11.11.2010 |
* In-charge of Training programmes, Vehicle cell, Civil works and all HR issues like Medical, Loans and Service matters of Engineering, Accounts & P&G employees. * Civil Construction works of 220kV & 132kV SS & lines. * Land Acquisition for the construction of new Substations. |
7. |
Executive Director |
APTRANSCO TSTRANSCO |
11.11.2010 02.06.2014 |
01.06.2014 27.11.2014 |
* In-charge of Training programmes, Vehicle cell, Civil works and all HR issues like Medical, Loans and Service matters of Engineering, Accounts & P&G employees. * Civil Construction works of 220kV & 132kV SS & lines. * Land Acquisition for the construction of new Substations. |
8. |
Director (Projects & HR) JMD (Comml. IPC, IT & Vig.) (FAC) |
TSTRANSCO TSTRANSCO |
27.11.2014 01.12.2014 |
05.08.2015 26.06.2015 |
*HRD & Training. * Departmental Examinations, Corporate Communications, Media and Printing. * Construction of 400 kV lines & SS * Vehicle cell (VS) * Maintenance of Vidyut Soudha * Purchases & Material Management * Lift Irrigation *Power Trading with IPPs, IEX and other traders, IT, Quality Control, Quality Assurance and other Vigilance matters |
9. |
Redesignated as Director (HR & Grid Operation) |
TSTRANSCO |
06.08.2015 |
07.08.2016 |
* All HR matters of Engineering, Accounts & P&G Services. * Grid Management *Purchases & Material Management (P&MM) |
10. |
Redesignated as Director (Projects & Grid Operation) |
TSTRANSCO |
08.08.2016 |
10.09.2018 |
*Construction of all 400kV EHT Lines & Substations *Grid Management. *System Studies. *Power Systems. * Civil maintenance of V.S. * Sita-Rama Lift Irrgn.Scheme |
11. |
Redesignated as Director (Projects) |
TSTRANSCO |
11.09.2018 |
Till date |
*Construction of all 400kV EHT Lines & Substations * Civil maintenance of V.S. * Sita-Rama Lift Irrgn.Scheme |
Sri Jonnada Surya Prakash
Career Profile |
|
|
Jonnada Surya Prakash has assumed charge as Director (Lift Irrigation ) of TSTRANSCO (Transmission Corporation of Telangana Ltd)., on 05-08-2015. |
|
Born on 13th November, 1947 in Hyderabad of undivided Andhra Pradesh (Now Telangana) |
|
He has rich and several years varied experience in Design & Procurement of EHT Substation equipment; Maintenance of Turbines; MRT & TRE works of EHT Substations; Construction, O&M works of EHT Substations up to 400 KV level of erst while APSEB & then APTransco since the start of his career as Asst Engineer in the Department in the year 1972. |
|
With commendable experience and good rapport with Irrigation sector, he has contributed for early completion of pending and newly launched Lift Irrigation Schemes of Telangana State namely Kalwakurthy LIS (Mahabubnagar), Bhakta Ramadasu LIS (Khammam), Sripadasagar Yellampally (Karimnagar) and AMRPLLC (Nalgonda). |
Sl. No. |
From |
To |
Worked in various capacities as in APSEB,APTRANSCO/TSTRANSCO |
Salient works done |
1. |
01.04.1972 |
20.03.1986 |
1.AE O/o SE/Tech Projects,VS,Hyd |
Design,Procurement of EHT Sub stations equipment monitoring and execution of various system improvement and construction works. |
2. |
22.03.1986 |
30.04.1986 |
ADE/Shift/RCPH Nagarjunasagar |
ADE/Shift/RCPH Nagarjunasagar |
3. |
30.04.1986 |
02.01.1989 |
ADE/Mechanical /Maintenance/NSHES |
Maintenance of Turbines,Penstock Gates, Dewatering Pumps,and D.G sets A.C plant of Nagarjuna sagar Main power House and Right Bank Canal Power House. |
4. |
09.01.1989 |
16.07.1989 |
ADE/Thermal O/o SE/Thermal-2/VS |
Design, Procurement of equipment and monitoring of progress of Gas Turbine Power Station at Vijjeswaram. |
5. |
16.07.1989 |
09.04.1997 |
ADE/Transmission O/o CE/Tr/VS/Hyd |
Design, Procurement of EHT equipment like Lightning Arrestors, Isolators, Insulators, Clamps and Connectors etc. required for EHT Sub Stations. Awarding erection contract of EHT Sub Stations, monitoring and execution and progress of EHT Sub Stations. |
6. |
09.04.1997 |
08.12.1999 |
DE/MRT / TL&SS / Hyderabad Zone |
M.R.T Protection and TRE works of all EHT Sub Stations in Medak, Mahaboob Nagar and Nalgonda districts, Testing and commission of Power Transformers, Circuit breakers, Current Transformers, Potential Transformer, Transformer and Feeder Control and relay panels, Batteries and battery chargers, Capacitor banks and CVTs. |
7. |
09.12.1999 |
27.07.2000 |
EE / E&M / O/o CE/Tr / VS /Hyd |
Design, Preparation of specification, calling of tenders and placing of Purchase orders. Inspection of equipment/Material procurement of ACSR, Panther/Zebra Conductor, Towers and accessories, Earth Wire, Disc insulators and Hard ware material for EHT lines. |
8. |
27.07.2000 |
31.05.2001 |
EE /TLC / Rural / Hyderabad |
Various Construction works of 220kV, 132kV Substations, Lines & Lift Irrigation Schemes were taken up and the works which were under execution were completed in Mahabubnagar, Nalgonda and Medak districts. |
9. |
31.05.2001 |
02.02.2002 |
EE / TLC / Ring Mains / Hyderabad |
In charge of Construction of EHT lines and Sub Stations in twin cities and R.R District. Many important 220kV & 132 kV SS an Line works, PTR enhancement works were executed in Twin cities & Ranga Reddy Dist. |
10. |
06.02.2002 |
01.10.2002 |
SE/TL & SS/Warangal |
In charge of Operation and Maintenance of all EHT sub Stations and Lines in Warangal and Khammam districts. |
11. |
3/10/2002 |
21-08-2004 |
SE/TLC/Hyderabad |
In charge of Construction of EHT lines and Substations in twin cities, RR district, Medak, Nalgonda, Mahabubnagar districts and under DFID Scheme in Khammam district. |
12. |
22-08-2004 |
30-11-2005 |
CE/TL&SS/Hyderabad Zone /Hyd |
In charge of EHT Sub Stations and Transmission lines Construction and O&M in Twin cities, R.R district, Medak, Nalgonda and Mahabubnagar districts (Hyderabad Zone). |
13. |
01.12.2005 |
04.08.2015 |
Post Retirement |
Carried out Design & Consultancy works for various Lift Irrigation Schemes / Hydel Stations in Andhra Pradesh (United), Madhya Pradesh and Uttarakhand. |
14. |
05.08.2017 |
Till date |
DIRECTOR / TSTRANSCO |
TSTRANSCO Board member and Construction Projects of Lift Irrigation Schemes in Telangana State. |
Career Profile
|
Born in Hyderabad on 6th February, 1957. Completed Graduation in B.Tech., Post Graduation in MBA (HR) and holding F.I.E., C.Engr. (Ind.). |
|
Assumed charge as Director of Transmission Corporation of Telangana Ltd., on 27.11.2014 and has been incharge of HR, Grid Operations and now Projects. Held Full Additional Charge as Jt. Managing Director of TSTRANSCO. |
|
Appointed as Non-Whole Time Director in TSNPDCL on 17.02.2016 and continuing till date. |
|
Served for more than 39 years in State Power Sector. |
|
Prior to the current position as Director, worked in various positions in erstwhile APSEB, APTRANSCO and in TSTRANSCO since December 1980 till date. |
Sl.No. |
Designation and place of posting |
Organization |
From |
To |
Nature of work / duties attended |
1. |
Assistant Engineer (AE) |
APSEB |
Dec’ 1980 |
14.11.1993 |
1)Turbine Maintenance at VTPS, Shift duties at KTPS. 2) O/o.SE/Plg/V.S.- preparation of plans, layouts and proposals for 220kV & 132kV lines & Substation works. 3) Operation & Distribution |
2. |
Assistant Divisional Engineer (ADE) |
APSEB |
15.11.1993 |
16.11.2001 |
1) In-Charge of Central Stores/Erragadda, 2)Operation & Distribution. 3) CBD- City-3, Charminar. In-charge of all FOCs. |
3. |
EME |
APGENCO |
16.11.2001 |
20.08.2002 |
As EME, in-charge of all coal plants, ash plants and fire fighting system in thermal stations. |
4. |
Divisional Engineer (DE) |
APTRANSCO |
20.08.2002 |
03.03.2005 |
As DE in-charge of Vehicle Cell, Preparation of estimates/ proposals for departmental/ hired vehicles and survey report of old departmental vehicles (field & Head Quarters). |
5. |
Superintending Engineer |
APTRANSCO |
03.03.2005 |
28.08.2006 |
As SE/V.S., in-charge of Vehicle Cell, Preparation of estimates/ proposals for departmental/ hired vehicles and survey report of old departmental vehicles (field & Head Quarters). |
6. |
Chief Engineer |
APTRANSCO |
28.08.2006 |
11.11.2010 |
* In-charge of Training programmes, Vehicle cell, Civil works and all HR issues like Medical, Loans and Service matters of Engineering, Accounts & P&G employees. * Civil Construction works of 220kV & 132kV SS & lines. * Land Acquisition for the construction of new Substations. |
7. |
Executive Director |
APTRANSCO TSTRANSCO |
11.11.2010 02.06.2014 |
01.06.2014 27.11.2014 |
* In-charge of Training programmes, Vehicle cell, Civil works and all HR issues like Medical, Loans and Service matters of Engineering, Accounts & P&G employees. * Civil Construction works of 220kV & 132kV SS & lines. * Land Acquisition for the construction of new Substations. |
8. |
Director (Projects & HR) JMD (Comml. IPC, IT & Vig.) (FAC) |
TSTRANSCO TSTRANSCO |
27.11.2014 01.12.2014 |
05.08.2015 26.06.2015 |
*HRD & Training. * Departmental Examinations, Corporate Communications, Media and Printing. * Construction of 400 kV lines & SS * Vehicle cell (VS) * Maintenance of Vidyut Soudha * Purchases & Material Management * Lift Irrigation *Power Trading with IPPs, IEX and other traders, IT, Quality Control, Quality Assurance and other Vigilance matters |
9. |
Redesignated as Director (HR & Grid Operation) |
TSTRANSCO |
06.08.2015 |
07.08.2016 |
* All HR matters of Engineering, Accounts & P&G Services. * Grid Management *Purchases & Material Management (P&MM) |
10. |
Redesignated as Director (Projects & Grid Operation) |
TSTRANSCO |
08.08.2016 |
10.09.2018 |
*Construction of all 400kV EHT Lines & Substations *Grid Management. *System Studies. *Power Systems. * Civil maintenance of V.S. * Sita-Rama Lift Irrgn.Scheme |
11. |
Redesignated as Director (Projects) |
TSTRANSCO |
11.09.2018 |
Till date |
*Construction of all 400kV EHT Lines & Substations * Civil maintenance of V.S. * Sita-Rama Lift Irrgn.Scheme |
Check For Latest Site Update(s)
Implementation of Telangana State Electricity Regulatory Commission (Forecasting, Scheduling, Deviation Settlement and Related Matters for Solar and Wind Generation Sources) Regulation No. 3 of 2018, Dt: 30.05.2018 from 01.04.2023 - Published on site (in Quick Menu)
Transmission losses for Open Access users - Published on site (in What's New)
Medical Credit Card Form for TGTransco Employees ( in What's New)
You can view our Website in Telugu also (Select Language in the footer menu)