Hi Guest !       Webmail     Language Indian Language       eOffice           What'sWhat's New                                                                                                                                                         Login 

ztstransco cmsir
ztstransco logo
zts dycmsir
Telangana2047

TRANSMISSION CORPORATION OF  TELANGANA LIMITED

VIDYUT SOUDHA : HYDERABAD-500 082 : TELANGANA STATE : INDIA

      ;                         RE Evacuation Capacity Details (Click Here)             ;                         Download Form 16 for Pensioners – AY 2025-26 (Click Here)                                        "Energy Saved Is Energy Produced”      

 

35,10,0,50,1
25,600,60,2,3000,5000,25,800
90,150,1,50,12,30,50,1,70,12,1,50,1,1,1,5000
0,1,1,0,0,40,15,5,0,1,0,20,0,1
Hon'ble Deputy CM addressing Power Utilities on Compassionate Appointments
Hon'ble Deputy CM addressing Power Utilities on Compassionate Appointments
Compassionate appointments Ceremony by Hon'ble Deputy CM and other dignitaries
Compassionate appointments Ceremony by Hon'ble Deputy CM and other dignitaries
Inauguration of 132/33KV Pammy SS by Hon'ble Deputy CM
Inauguration of 132/33KV Pammy SS by Hon'ble Deputy CM
400/220/132/33KV Raidurg Gas Insulated Substation
400/220/132/33KV Raidurg SS
400/220/132/33KV Raidurg SS
The glimse of Switchgear of newly inaugurated Suryapet 400 KV Substation
400 KV Suryapet Substation Switchgear
400 KV Suryapet Substation Switchgear

About Us

Director (Projects & Transmission) - Profile

 

Sri G.Narsing Rao

Director (Projects & Transmission)

 
 
 
Vidyut Soudha, Khairatabad Hyderabad Telangana 500082 India
Telephone: +91-40-23395325
Fax: +91-40-23396027

Career Profile

Born in Hyderabad on 6th February, 1957. Completed Graduation in B.Tech., Post Graduation in MBA (HR) and holding F.I.E., C.Engr. (Ind.).
Assumed charge as Director of Transmission Corporation of Telangana Ltd., on 27.11.2014 and has been incharge of HR, Grid Operations and now Projects. Held Full Additional Charge as Jt. Managing Director of TSTRANSCO.
Appointed as Non-Whole Time Director in TSNPDCL on 17.02.2016 and continuing till date.
Served for more than 39 years in State Power Sector.
Prior to the current position as Director, worked in various positions in erstwhile APSEB, APTRANSCO and in TSTRANSCO since December 1980 till date.
Service Details

Sl.No.

Designation and place of posting

Organization

From

To

Nature of work / duties attended

1.

Assistant Engineer (AE)

APSEB

Dec’ 1980

14.11.1993

1)Turbine Maintenance at VTPS, Shift duties at KTPS.

2) O/o.SE/Plg/V.S.- preparation of plans, layouts and proposals for 220kV & 132kV lines & Substation works.

3) Operation & Distribution

2.

Assistant Divisional Engineer (ADE)

APSEB

15.11.1993

16.11.2001

1) In-Charge of Central Stores/Erragadda,

2)Operation & Distribution.

3) CBD- City-3, Charminar. In-charge of all FOCs.

3.

EME

APGENCO

16.11.2001

20.08.2002

As EME, in-charge of all coal plants, ash plants and fire fighting system in thermal stations.

4.

Divisional Engineer (DE)

APTRANSCO

20.08.2002

03.03.2005

As DE in-charge of Vehicle Cell, Preparation of estimates/ proposals for departmental/ hired vehicles and survey report of old departmental vehicles (field & Head Quarters).

5.

Superintending Engineer

APTRANSCO

03.03.2005

28.08.2006

As SE/V.S., in-charge of Vehicle Cell, Preparation of estimates/ proposals for departmental/ hired vehicles and survey report of old departmental vehicles (field & Head Quarters).

6.

Chief Engineer

APTRANSCO

28.08.2006

11.11.2010

* In-charge of Training programmes, Vehicle cell, Civil works and all HR issues like Medical, Loans and Service matters of Engineering, Accounts & P&G employees.

* Civil Construction works of 220kV & 132kV SS & lines.

* Land Acquisition for the construction of new Substations.

7.

Executive Director

APTRANSCO

TSTRANSCO

11.11.2010

02.06.2014

01.06.2014

27.11.2014

* In-charge of Training programmes, Vehicle cell, Civil works and all HR issues like Medical, Loans and Service matters of Engineering, Accounts & P&G employees.

* Civil Construction works of 220kV & 132kV SS & lines.

* Land Acquisition for the construction of new Substations.

8.

Director (Projects & HR)








JMD (Comml. IPC, IT & Vig.) (FAC)

TSTRANSCO









TSTRANSCO

27.11.2014









01.12.2014

05.08.2015









26.06.2015

*HRD & Training.

* Departmental Examinations, Corporate Communications, Media and Printing.

* Construction of 400 kV lines & SS

* Vehicle cell (VS)

* Maintenance of Vidyut Soudha

* Purchases & Material Management

* Lift Irrigation

*Power Trading with IPPs, IEX and other traders, IT, Quality Control, Quality Assurance and other Vigilance matters

9.

Redesignated as Director (HR & Grid Operation)

TSTRANSCO

06.08.2015

07.08.2016

* All HR matters of Engineering, Accounts & P&G Services.

* Grid Management

*Purchases & Material Management (P&MM)

10.

Redesignated as Director (Projects & Grid Operation)

TSTRANSCO

08.08.2016

10.09.2018

*Construction of all 400kV EHT Lines & Substations

*Grid Management.

*System Studies.

*Power Systems.

* Civil maintenance of V.S.

* Sita-Rama Lift Irrgn.Scheme

11.

Redesignated as Director (Projects)

TSTRANSCO

11.09.2018

Till date

*Construction of all 400kV EHT Lines & Substations

* Civil maintenance of V.S.

* Sita-Rama Lift Irrgn.Scheme

* Palamuru-Ranga Reddy Lift Irrgn. Scheme

Check For Latest Site Update(s)    

 

Implementation of Telangana State Electricity Regulatory Commission (Forecasting, Scheduling, Deviation Settlement and Related Matters for Solar and Wind Generation Sources) Regulation No. 3 of 2018, Dt: 30.05.2018 from 01.04.2023 - Published on site (in Quick Menu)

Transmission losses for Open Access users - Published on site (in What's New)

Medical Credit Card Form for TGTransco Employees ( in What's New)

You can view our Website in Telugu also (Select Language in the footer menu)